HRBR Layout metro station

From Wikipedia, the free encyclopedia

LocationNH 44, Babusabpalya, Kalyan Nagar, Bengaluru, Karnataka 560043
Coordinates13°01′21″N 77°38′51″E / 13.02254°N 77.64739°E / 13.02254; 77.64739
System
Namma Metro station
HRBR Layout
Under Construction of this metro station under Phase 2B of Namma Metro's Blue Line as of August 2025
General information
LocationNH 44, Babusabpalya, Kalyan Nagar, Bengaluru, Karnataka 560043
Coordinates13°01′21″N 77°38′51″E / 13.02254°N 77.64739°E / 13.02254; 77.64739
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBus interchange Babusapalya Bus Stop
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2027; 19 months' time (December 2027) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Horamavu Blue Line
(Future Service)
Kalyan Nagar
Location

HRBR Layout metro station is an upcoming elevated metro station on HRBR Layout area on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the main Babusapalya Park, followed by the main Hennur Police Station, Pai Internationals (Electronics Supermarket), Karnataka Power Transmission Corporation (HRBR Branch) and Royal Enfield Bike Showroom (HRBR Branch). This metro station is slated to become operational around June 2026.[2][3][4][5]

HRBR Layout metro station surrounding area

HRBR Layout also known as Hennur Road Banaswadi Road Layout is a planned area in Bengaluru that was primarily developed in the year 1984-85 by the Bangalore Development Authority (BDA). The layout was formed on the dried-up Channasandra Tank.[6]  HRBR Layout is popular for nightlife and shopping in the areas of 5th Main Road, 7th Main road, CMR Main Road, 80 Feet Road and PNS Layout.

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the HRBR Layout metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [8]

Station layout

Station Layout - To Be Confirmed

HRBR Layout track layout (TBC)
P# to Horamavu **
P# to Kalyan Nagar **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Horamavu
Platform #
Westbound
Towards ← Hebbala / KIAL Terminals
Next Station: Kalyan Nagar
Side platform | Doors will open on the left Disabled access
L2

See also

References

Related Articles

Wikiwand AI