Tengah Depot
From Wikipedia, the free encyclopedia
Location3 Tengah Close
Singapore 699859[1]
Singapore 699859[1]
OperatorSingapore One Rail (SBS Transit and RATP Dev Asia Pacific)
Tengah Depot construction site in June 2022 | |
![]() Interactive map of Tengah Depot 登加车厂 Depo Tengah | |
| Location | |
|---|---|
| Location | 3 Tengah Close Singapore 699859[1] |
| Coordinates | 1°21′52″N 103°42′42″E / 1.36455°N 103.71171°E |
| Characteristics | |
| Owner | Land Transport Authority |
| Operator | Singapore One Rail (SBS Transit and RATP Dev Asia Pacific) |
| Type | At-Grade |
| Roads | Tengah Way, Tengah Close (currently only accessible by construction vehicles) |
| Rolling stock | Hyundai Rotem J151 |
| Routes served | JRL Jurong Region Line |
| History | |
| Opened | mid-2028 |
Tengah Depot is a future integrated train and bus depot in Tengah, Singapore. At 44.5 ha (110 acres), the at-grade depot will house 100 trains of the Jurong Region Line (JRL) fleet and house 600 buses.[2] The depot will be located along the line between the Hong Kah and Corporation stations. Other facilities of the depot include the Operations Control Centre (OCC) for the JRL. First announced in 2018, the depot is expected to be completed in mid-2028 along with the first stage of the JRL.
